A store water overflow tank was constructed by pre-cast concrete rings sunk to a depth of 30m. The base slab was then cast out of reinforced concrete.
A store water overflow tank was constructed by pre-cast concrete rings sunk to a depth of 30m. The base slab was then cast out of reinforced concrete.
Two 8 storey blocks of flats that are situated in Wythenshawe…
Urban Hub is a 2500m2+ project located in the centre of Preston. Construction Techniques were lucky enough…
Pilgrim Hospital…..
Blink Photo is a multi-disciplinary project carried out by Construction Techniques.
Shortly before the 2006 Open Golf Championship at Hoylake, Network Rail were refurbishing the station and its associated structures.
As part of the refurbishment of the historic old fire station, which is a listed building within the Unesco…
As part of the conversion of the old liberal club in Prenton to self-contained accommodation for autistic residence…
A store water overflow tank was constructed by pre-cast concrete rings sunk to a depth of 30m. The base slab was then cast out of reinforced concrete.
The project involved the refurbishment of a multistorey office block occupied by Manchester City Council administration staff.